driveway gate installation

New Gate Installation in Plano, TX

A gate installation is really four jobs that have to agree with each other: the gate itself, the posts and footings that carry it, the power and automation, and the access control. Most of the bad installations we are later called to fix went wrong at the interfaces — a beautiful gate on undersized footings, an operator too small for the leaf, no conduit run so the keypad ended up on a surface-mounted cable, or safety devices treated as an afterthought. In North Texas there are two extra questions worth settling on day one: how deep the footings have to go for the clay under that particular driveway, and how the gate opens when an ice storm has had the power out for three days.

Material Is Settled Before Anything Is Cut

Ornamental steel is the strongest and the most repairable — it can be welded and matched years later — provided the coating is kept up. Aluminium will not rust and is lighter on hinges and operator, but it dents more readily under hail and impact. Wood is almost always infill on a steel or aluminium frame rather than structure. That choice fixes the leaf weight, which in turn fixes the footing, the hinges and the operator, so it comes first.

Footings Are Sized for the Clay, Not Just the Gate

Expansive clay is why a footing here goes deeper than leaf weight alone would suggest: the concrete has to reach past the layer that swells and shrinks with the seasons, or the post moves with it. This is also the part of the programme nobody can compress, because footings cure before a gate is hung and loaded onto them. Conduit for power and keypads or intercoms goes in during the same dig, since retrofitting it means cutting the drive.

Approval Comes Before Fabrication

Most driveway gates in the Collin County suburbs sit inside an HOA with architectural review, and a community entry puts a board in the same loop. Height, colour, material and infill pattern are typically what gets looked at. Submitting a drawing before a custom gate is fabricated costs nothing; finding the restriction after it is welded can cost the gate. We will tell you what we know of the local pattern, but confirming it stays with the owner.

How long does it take? Most residential installations run 2–4 days including footing cure time, which cannot be rushed. Custom fabricated gates add lead time before any of that starts.

Frequently Asked Questions

Swing gate or slide gate — how do I choose?
Mostly the site decides. A swing gate needs clear arc on the inside, level ground through that arc, and a driveway long enough that the gate is not swinging into the road or into a car waiting on it. A slide gate needs run-back room along the fence line to the side. Sloping driveways push you toward slide; short driveways almost always do. Where the driveway collects debris or sits on ground that moves seasonally, a cantilever slide gate avoids a ground track entirely, which is a genuine advantage on this clay.
How long does an installation actually take?
The gate goes up quickly; the concrete decides the schedule. Footings for gate posts have to be sized for the leaf they carry and then allowed to cure before the gate is hung and loaded — rushing that is exactly how you get a post that leans in two years. Expect several days for a straightforward residential install, longer where a custom gate is being fabricated or where power has to be run out to the gate.
Do I need power run to the gate, or is solar enough?
Both work; the site decides again. Solar is genuinely good on open, sunny lots and on long acreage drives where trenching power hundreds of feet would cost more than the gate — which is the normal situation on the acreage drives out toward Wylie. Solar is a poor choice under heavy canopy, and the mature tree cover on Richardson's older streets is the clearest example nearby. Solar also has to be sized for winter, when days are short, and for the week of overcast after a storm.
What permits or approvals do I need?
It varies more across this area than people expect, and it is worth checking before fabrication rather than after. Plano, Frisco, Allen, McKinney and Richardson each permit separately, and each has its own rules on how tall a gate may be and how far back from the street it has to sit. Unincorporated Collin County is different again. And in a place this heavily platted the HOA is usually the harder approval: most of the newer subdivisions have an architectural review committee whose sign-off you want before anything is fabricated, because appearance is an approval question there before it is a technical one. We will tell you what we know; confirming it is on the owner.
What is the difference between iron, aluminium and wood?
Ornamental steel or wrought iron is the strongest and the most repairable — it can be welded and matched indefinitely — but it needs its coating maintained or it will rust here. Aluminium does not rust, which is a real advantage, but it is softer and less tolerant of impact, and hail is the impact that finds it here. Wood looks the way many owners want and is the least suited to a North Texas summer, which greys and splits it, so it is usually built on a steel or aluminium frame with the timber as infill.
Should the gate open automatically for someone leaving?
Most owners want that, and it is done with an exit device: a buried loop, an infrared sensor, or a free-exit probe. Loops are the most common and the most reliable when installed well, but they are cut into the driveway, and the clay under that driveway moves enough here to open the saw cut and shear the wire. Where that is a concern, above-ground exit sensing avoids putting wire in the concrete. This is worth deciding at install time, because retrofitting a loop means saw-cutting a driveway you have just finished.
How does the gate open when the power is out?
Two answers, and you want both. Every operator has a manual release that disconnects the motor so the gate can be moved by hand — you should know where yours is and be able to reach it from the side you will be stuck on. And a battery backup will keep the gate working normally for a number of cycles. In North Texas, where an ice storm can take the power out for days, a backup is not a luxury item.
Can you automate a gate I already have?
Often, yes, and it is a common request. What has to be checked first is whether the existing gate and posts can take it. Manual gates are frequently hung on hardware sized for occasional hand operation, not for an operator cycling it under power several times a day. If the posts, footings and hinges are sound, adding automation is straightforward. If they are not, automating the gate will simply find that out for you, expensively.

Related Services

These related repairs often turn up on the same gate — we can take care of them in the same visit:

Free · No Obligation

Get Your Free Quote

Send a few details and a local dispatcher calls you back with a price range and an arrival window — usually within 15 minutes during business hours.

  • Answered locally, not a national call center
  • Arrival window confirmed by text before we roll
  • Price approved by you before any work starts
  • We’ll tell you if it’s a quick fix, not sell you an operator

Request a Free Quote

Gate stuck open? Call (945) 335-9880 — we prioritize gates left open and vehicles shut in.

Got it — thank you.

A local dispatcher will call you shortly with a price range and an arrival window. Need us sooner? (945) 335-9880